AIRAYS RSC‑800‑500 Cup‑making Machine|Upper Mold Mounting Operation Guide
This official operation video demonstrates the complete upper mold installation workflow for AIRAYS RSC‑800‑500 all‑servo cup‑making thermoforming machine. This positive‑pressure forming equipment is engineered for mass‑production of disposable beverage cups, coffee cups, milk cups, food bowls and various plastic food containers. It offers broad material compatibility, supporting A‑PET, R‑PET, C‑PET, BOPS, HIPS, PP, PLA, PVC and barrier sheet materials for different packaging requirements.
Mold change‑over directly influences overall equipment effectiveness for thermoforming workshops. Improper upper mold mounting may cause mis‑alignment, uneven product wall thickness, abnormal machine vibration or unexpected shutdown. Therefore, operators must strictly follow standardized installation procedures shown in this video. The whole procedure includes pre‑installation inspection, mold surface cleaning, lifting and hoisting preparation, coarse positioning, fine alignment, bolt cross‑locking, gap calibration and pre‑test run check.
Benefiting from the machine’s built‑in quick‑change mold system together with four‑column plus five‑point structural connecting‑rod mechanical structure, qualified technicians can finish upper mold mounting efficiently, effectively reducing non‑productive downtime during product or cavity switching. All servo‑driven mold opening‑closing structure delivers high‑precision movement, low mechanical wear and low‑noise running after correct mold installation.
We recommend that installation and mold replacement shall be completed by trained technical staff. Before formal mass‑production after mold setup, please perform low‑speed empty stroke test and short sheet trial run, check clamping clearance, locking status and forming quality, to confirm everything works within normal operating range.
Mold change‑over directly influences overall equipment effectiveness for thermoforming workshops. Improper upper mold mounting may cause mis‑alignment, uneven product wall thickness, abnormal machine vibration or unexpected shutdown. Therefore, operators must strictly follow standardized installation procedures shown in this video. The whole procedure includes pre‑installation inspection, mold surface cleaning, lifting and hoisting preparation, coarse positioning, fine alignment, bolt cross‑locking, gap calibration and pre‑test run check.
Benefiting from the machine’s built‑in quick‑change mold system together with four‑column plus five‑point structural connecting‑rod mechanical structure, qualified technicians can finish upper mold mounting efficiently, effectively reducing non‑productive downtime during product or cavity switching. All servo‑driven mold opening‑closing structure delivers high‑precision movement, low mechanical wear and low‑noise running after correct mold installation.
We recommend that installation and mold replacement shall be completed by trained technical staff. Before formal mass‑production after mold setup, please perform low‑speed empty stroke test and short sheet trial run, check clamping clearance, locking status and forming quality, to confirm everything works within normal operating range.
Cup Making Machine Products
Cup Making Machine Videos
▶
Plastic Cup Making Machine
▶
Plastic cup lid machine
▶
Coffee cup lid forming machine
▶
Plastic Cup Thermoforming Machine
▶
PET Cup Thermoforming Machine Test Completed
▶
PET Plastic Cup Thermoforming Machine Test | High Speed Cup Making Machine
▶
Plastic cup manufacturing machine
▶
Plastic Cup Blowing + Auto Stacking | AIRAYS Thermoforming Machine
language
English
Русский
España
Français
عربي
中文版